Update on the garage conversion carried out in Bicester

Since the last entry, we have knocked down the wall between the existing living room and garage to open the room up. The garage door has been removed, bricked up with insulation placed between the bricks. The space remaining on the brick wall will have a window placed inside of it. The other building work carried out was insulating the floor with a polythene sheet, celotex then the underfloor heating placed on top. The liquid screed went in along with insulating the stud wall, ready for plastering. Since the room has been plastered the electrics have been connected. Now waiting for the plaster to dry to start the decorating! See photos below of the updates :)